OUR ACHIEVEMENTS
- ACCUEIL
- OUR ACHIEVEMENTS

Some actions carried out in the field
Some actions carried out in the field
-
Project 149 RBS (2G) of ERICSSON / MOOV BENIN (35 sites);
-
BJ27 MTN Benin project (10 sites)
-
SITAC MTN Benin project (4 sites)
-
Installation of the MOOV Backbone (13 bonds);
-
3G from Moov;
-
Installation and connection of FO cable head;
-
Survey C MODULE for INTELLIGENCE ERA;
-
Installation of MTN's 3G network
-
Setting up of GSM sites with LIBERCOM;
-
installation of beams alignment on the –MOOV network;
-
ACDB Rack Mount for HUAWEI sites.
-
Repeater installation
-
VSAT installation - solar panel - and omni-directional GSM antenna
I am tab #3 content. Click edit button to change this text. Drops of rain could be heard hitting the pane, which made him feel quite sad. How about if I sleep a little bit longer and forget all this nonsense.
I am tab #3 content. Click edit button to change this text. Drops of rain could be heard hitting the pane, which made him feel quite sad. How about if I sleep a little bit longer and forget all this nonsense.
I am tab #3 content. Click edit button to change this text. Drops of rain could be heard hitting the pane, which made him feel quite sad. How about if I sleep a little bit longer and forget all this nonsense.
I am tab #3 content. Click edit button to change this text. Drops of rain could be heard hitting the pane, which made him feel quite sad. How about if I sleep a little bit longer and forget all this nonsense.
I am tab #3 content. Click edit button to change this text. Drops of rain could be heard hitting the pane, which made him feel quite sad. How about if I sleep a little bit longer and forget all this nonsense.
I am tab #3 content. Click edit button to change this text. Drops of rain could be heard hitting the pane, which made him feel quite sad. How about if I sleep a little bit longer and forget all this nonsense.